Medical Suites & Offices (Class 5 buildings)

back

One of the most common projects we see is a house being converted into a medical centre. These projects are usually straightforward, but almost always trigger one key fire compliance issue:

Walls and openings within 3 metres of a boundary.

This requires a Performance Solution, documented through a Fire Engineering Brief (FEB) and Fire Engineering Report (FER). We handle this process regularly and can deliver the documentation you need quickly and efficiently got your Building Permit

 

For office buildings, the needs are much the same — sometimes with additional hydrant coverage drawings or fire protection design depending on the size and layout.

More broadly, for any Class 5 building project, we can help you with:

  • FEB/FER performance solutions for boundary walls and other compliance issues

  • Hydrant coverage drawings & block plans

  • Fire protection designs ready for building permit approval

Just send us your drawings and project details, and we’ll make sure your fire compliance is covered from start to finish.